TSQ

网络  临时存储队列; 可靠性整体解决方案; 实施质量总体解决方案; 问卷; 存储队列

化学



双语例句

  1. The Fault Analysis and Improvement Suggestion on DC Filter Capacitor at Converter Station of TSQ
    天生桥换流站直流滤波电容器故障原因分析及改进建议
  2. Reformation of Protection against Lightning for the Safety Monitoring Automation System for Diversion Tunnel in TSQ ⅱ Hydropower Station
    天生桥Ⅱ级水电站引水隧洞安全监测系统防雷改造
  3. Presentation on the primary circuit design in the bidding design stage for TSQ-ⅰ Hydropower Project
    天生桥一级水电站招标设计阶段电工一次设计介绍
  4. This article gives a presentation on the construction condition and peculiarities of con-crete-faced rockfill dam of TSQ-ⅰ Project. Ideas on river flow control plan, selection of alter-natives, design principle and construction scheduling for concrete-faced rockfill dam are also dis-cussed.
    本文介绍了天生桥一级水电站面板堆石坝的建设条件和特点,河道水流控制的规划思想、方案比较选择、设计原则,和面板堆石坝施工程序安排。
  5. Reminiscences of Construction for TSQ-1 Hydropower Project
    天生桥一级水电站建设八年的回顾
  6. The briefing on design work of Danjiangkou dam heightening and several key techniques concerned are described. Current status of utilizing foreign currency for TSQ-ⅰ Hydropower Project
    介绍了丹江口大坝加高设计工作简况、特点及加高设计中几个关键技术问题的处理措施。天生桥一级水电站利用外资进行的工作简况
  7. The Role of Consulting Services in the Construction of TSQ-1 Project
    咨询活动在天生桥一级水电站建设中发挥的作用
  8. Analysis of Settlement Payment of Lot C_3 for TSQ-ⅰ Hydropower Station
    天生桥一级水电站C3标工程结算支付分析
  9. Based on the investment, construction and supervision of TSQ-ⅰ HydroelectricProject, the TSQ-ⅰ Project payment settlement management system was developed.
    天生桥一级水电站工程结算月报表管理系统主要是根据天生桥一级水电站的工程投资、工程施工以及长委会监理部对工程进行全面监理的实际情况出发编制开发而成的。
  10. Consolidation Grouting Construction of Spillway Flip-bucket for TSQ-1 Hydropower Station
    天生桥一级水电站溢洪道挑流鼻坎固结灌浆施工
  11. The construction of TSQ I dam paid attention to the following links: Strict quality management and strict quality control is the key to project construction success;
    在天生桥一级大坝建设中,重点抓住了以下环节:严格的质量管理和严格的质量控制是工程建设成功的关键;
  12. High slope design in the power house area of TSQ ──ⅰ Hydropower Project
    天生桥一级水电站厂区高边坡设计
  13. During the construction of TSQ ⅰ CFRD, some problems including the separation of deck from the cushion on the top of phase ⅰ and phase ⅱ decks, cracking of the slope face of cushion and partial deck occurred.
    在天生桥一级水电站混凝土面板堆石坝的施工中,发生了一、二期面板顶部脱空、上游垫层坡面开裂和面板局部裂缝问题。
  14. River water flow control and construction program planning of concrete-face rock fill dam for TSQ-ⅰ Hydropower Project
    天生桥一级水电站河道水流控制与面板堆石坝施工程序规划